The roof is 98% complete on the addition. This is great news as the weather will not be a deterrent to construction progress. The 2% remaining is where all the heating/air conditioning rooftop units will be installed. They are temporarily covered until the HVAC subcontractor arrives. All of the HVAC units are on site, an installation just needs to be completed.
The building is also now set up with a more permanent and efficient heat source as the general contractor is heating the entire area, especially the commons that needs to be thawed out in order to pour the floor.
The block layers have a few odds and ends on the commons restrooms before they begin to brick the exterior. The exterior consists of a 4 foot brick and then insulation covered by a stucco-type finish from the brick up.
More pictures will be posted soon.